Commercial EV charging installation in Orange County.
Level 2 and DC fast chargers for workplace, retail, fleet, multi-tenant and municipal sites, with the electrical and site work built by the same team.
Chargers are the easy part.
Most of a charging project is the power behind it: service capacity, switchgear, trenching, concrete and accessible parking. Burge Energy builds all of it, and pairs charging with solar or storage where it helps.
Level 2 charging
Workplace, retail, hospitality and multi-tenant charging for longer stays.
DC fast charging
Fast chargers for retail corridors, fleets and public sites, including sites pursuing California's fast charger programs.
Fleet charging
Depot charging with smart load management, plus software, billing and reporting support.
Service and site work
Load calculations, utility service design, switchgear, trenching and paving built by the same team.
Battery-supported charging
Storage that can help serve fast chargers where utility capacity is limited.
Battery storage →How a project runs.
Burge can join at any stage, from early budgeting to a design that is ready to build.
Site and capacity
Review of the site, existing electrical service and charging needs.
Layout and power
Charger layout, load calculations and utility service design.
Permits and utility
Permit set and utility coordination.
Install and commission
Trenching, electrical, chargers, commissioning and turnover.
Keep reading on EV charging.
Sourced articles and resources from Burge Energy.
Questions owners ask first.
Straight answers before you call.
What EV chargers do you install?
Level 2 and DC fast chargers, fleet charging systems and smart load management, with support for software, billing and reporting.
Can my electrical service support EV chargers?
That depends on your existing service and how many chargers you need. Burge starts with load calculations and, when needed, designs the utility service upgrade.
Are there incentives for commercial EV charging in California?
California runs fast charger programs with set application windows. Our article on the California EV fast charger incentive covers the current round. You or your advisors apply directly with the program administrator.
Can you add chargers to an existing parking lot?
Yes. Burge Energy installs charging at existing sites as well as new construction, including trenching, concrete and accessible parking.

